GRIFFIN HOSPITAL IS INVITING BIDDING FOR THE REMOVAL OF THE CURRENT BACK UP EMERGENCY GENERATOR AND REPLACEMENT /CONNECTION OF A NEW EMERGENCY BACKUP GENERATOR
Griffin Hospital is accepting bids for the removal of the current back up emergency generator and replacement/ connection of a new emergency backup generator.
CLICK HERE to view Addendum #2-REVISED which modifies and clarifies the RFP
CLICK HERE to view Addendum #4
As is articulated in Addendum #4, the contract award date has been extended to on or about October 21, 2024.
Pre-bid Meeting: All potential bidders are advised to attend a pre-bid meeting at the project location on Wednesday, August 14, 2024 at 10:00 am local time.
A second Pre-bid meeting is scheduled for August 26, 2024 at 10:00 a.m. local time.
Please present to the front of the main building at 130 Division Street, Derby, CT
Proposals shall be due on or before August 30, 2024, 4:00 p.m.
As is articulated in Addendum 2-REVISED, item #5, proposals shall be due no later than September 26, 2024, 4:00 p.m.
Please submit two hard copies of all bids and an electronic version on a thumb drive to: Patrick Charmel, President & CEO, Griffin Hospital, 130 Division Street, Derby, CT 06418.
Supporting Documents:
DELINEATION OF RESPONSIBILITY BETWEEN THE CONTRACTOR AND GRIFFIN HEALTHCARE
PROPOSED SEQUENCE OF CONSTRUCTION
SPECIFICATIONS FOR PHASE 2 EMERGENCY GENERATOR AND DISTRIBUTION UPGRADES
EMERGENCY GENERATOR AND DISTRIBUTON UPGRADES
DECD CONSTRUCTION SIGN TEMPLATE
ADDENDUM #2 (See ADDENDUM #2 – REVISED below)
Pre-Bid #1 Sign-In Sheet (08-14-24)
Pre-Bid #2 Sign-In Sheet (08-26-24)
For information about phase 1 of this project, which has already been bid and which is underway, please visit https://www.griffinhealth.org/news/griffin-hospital-is-inviting-bidding-for-the-removal-of-the-current-underground-storage-tank-and-replacement-of-an-unground-fuel-storage-tank.